Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do
This resource from NREL outlines the key decisions and actions that public utility commissions must undertake to implement IEEE Std 1547 2018, the revised interconnection standard for distributed energy resources. It explains policy choices such as adopting default ride through settings, requiring communications capabilities, and aligning testing and certification procedures. The guidance provides decision flowcharts, recommended timelines, and case studies from early adopter states. It aims to help regulators design interconnection rules that comply with the standard while considering regional grid needs and stakeholder input.
Citation Formats
TY - DATA
AB - This resource from NREL outlines the key decisions and actions that public utility commissions must undertake to implement IEEEĀ StdĀ 1547 2018, the revised interconnection standard for distributed energy resources. It explains policy choices such as adopting default ride through settings, requiring communications capabilities, and aligning testing and certification procedures. The guidance provides decision flowcharts, recommended timelines, and case studies from early adopter states. It aims to help regulators design interconnection rules that comply with the standard while considering regional grid needs and stakeholder input.
AU - Boemer, Dr. Jens C.
DB - C-MIX - Community Microgrid Information Exchange
DP - Open EI | National Laboratory of the Rockies
DO -
KW - Battery energy storage
KW - Solar
KW - Photovoltaics
KW - PV
KW - Diesel generators
KW - Other liquid-fuel generators
KW - Wind energy
KW - Standards
KW - Interconnection
KW - Protection
KW - Case studies
KW - Performance
KW - Community engagement
KW - Tribal engagement
KW - Stakeholder engagement
KW - Power plant controls
KW - SCADA
LA - English
DA - 2018/08/21
PY - 2018
PB - Electric Power Research Institute
T1 - Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do
UR - https://cmix.openei.org/submissions/185
ER -
Boemer, Dr. Jens C. . Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do. Electric Power Research Institute, 21 August, 2018, C-MIX - Community Microgrid Information Exchange. https://cmix.openei.org/submissions/185.
Boemer, D. (2018). Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do. [Data set]. C-MIX - Community Microgrid Information Exchange. Electric Power Research Institute. https://cmix.openei.org/submissions/185
Boemer, Dr. Jens C. . Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do. Electric Power Research Institute, August, 21, 2018. Distributed by C-MIX - Community Microgrid Information Exchange. https://cmix.openei.org/submissions/185
@misc{CMIX_Dataset_185,
title = {Applying IEEE Std 1547-2018: What Public Utilities Commissions Need To Decide and Do},
author = {Boemer, Dr. Jens C. },
abstractNote = {This resource from NREL outlines the key decisions and actions that public utility commissions must undertake to implement IEEE Std 1547 2018, the revised interconnection standard for distributed energy resources. It explains policy choices such as adopting default ride through settings, requiring communications capabilities, and aligning testing and certification procedures. The guidance provides decision flowcharts, recommended timelines, and case studies from early adopter states. It aims to help regulators design interconnection rules that comply with the standard while considering regional grid needs and stakeholder input.},
url = {https://cmix.openei.org/submissions/185},
year = {2018},
howpublished = {C-MIX - Community Microgrid Information Exchange, Electric Power Research Institute, https://cmix.openei.org/submissions/185},
note = {Accessed: 2026-06-17}
}
Details
Data from Aug 21, 2018
Last updated Mar 30, 2026
Submitted Jun 2, 2026
Organization
Electric Power Research Institute
Contact
Dr. Jens C. Boemer

