This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.

Citation Formats

TY - DATA AB - This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures. AU - Fix, Elliott A2 - Banerjee, Abhishek A3 - Muenz, Ulrich A4 - Seo, Gab-Su DB - C-MIX - Community Microgrid Information Exchange DP - Open EI | National Laboratory of the Rockies DO - 10.1109/ISGT51731.2023.10066412 KW - Power electronics and inverters KW - Power electronics KW - Inverters KW - Battery energy storage KW - Solar KW - Photovoltaics KW - PV KW - Diesel generators KW - Other liquid-fuel generators KW - Standards KW - Interconnection KW - Protection KW - Case studies KW - Performance KW - Local energy resources (LER) LA - English DA - 2023/01/01 PY - 2023 PB - Siemens T1 - Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters UR - https://doi.org/10.1109/ISGT51731.2023.10066412 ER -
Export Citation to RIS
Fix, Elliott, et al. Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. Siemens, 1 January, 2023, C-MIX - Community Microgrid Information Exchange. https://doi.org/10.1109/ISGT51731.2023.10066412.
Fix, E., Banerjee, A., Muenz, U., & Seo, G. (2023). Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. [Data set]. C-MIX - Community Microgrid Information Exchange. Siemens. https://doi.org/10.1109/ISGT51731.2023.10066412
Fix, Elliott, Abhishek Banerjee, Ulrich Muenz, and Gab-Su Seo. Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. Siemens, January, 1, 2023. Distributed by C-MIX - Community Microgrid Information Exchange. https://doi.org/10.1109/ISGT51731.2023.10066412
@misc{CMIX_Dataset_104, title = {Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters}, author = {Fix, Elliott and Banerjee, Abhishek and Muenz, Ulrich and Seo, Gab-Su}, abstractNote = {This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100\% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.}, url = {https://cmix.openei.org/submissions/104}, year = {2023}, howpublished = {C-MIX - Community Microgrid Information Exchange, Siemens, https://doi.org/10.1109/ISGT51731.2023.10066412}, note = {Accessed: 2026-11-28}, doi = {10.1109/ISGT51731.2023.10066412} }
https://dx.doi.org/10.1109/ISGT51731.2023.10066412

Details

Data from Jan 1, 2023

Last updated Mar 30, 2026

Submitted Jun 2, 2026

Organization

Siemens

Contact

Gab-Su Seo

Authors

Elliott Fix

Siemens

Abhishek Banerjee

Siemens

Ulrich Muenz

Siemens

Gab-Su Seo

NLR