Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters
This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.
Citation Formats
TY - DATA
AB - This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.
AU - Fix, Elliott
A2 - Banerjee, Abhishek
A3 - Muenz, Ulrich
A4 - Seo, Gab-Su
DB - C-MIX - Community Microgrid Information Exchange
DP - Open EI | National Laboratory of the Rockies
DO - 10.1109/ISGT51731.2023.10066412
KW - Power electronics and inverters
KW - Power electronics
KW - Inverters
KW - Battery energy storage
KW - Solar
KW - Photovoltaics
KW - PV
KW - Diesel generators
KW - Other liquid-fuel generators
KW - Standards
KW - Interconnection
KW - Protection
KW - Case studies
KW - Performance
KW - Local energy resources (LER)
LA - English
DA - 2023/01/01
PY - 2023
PB - Siemens
T1 - Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters
UR - https://doi.org/10.1109/ISGT51731.2023.10066412
ER -
Fix, Elliott, et al. Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. Siemens, 1 January, 2023, C-MIX - Community Microgrid Information Exchange. https://doi.org/10.1109/ISGT51731.2023.10066412.
Fix, E., Banerjee, A., Muenz, U., & Seo, G. (2023). Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. [Data set]. C-MIX - Community Microgrid Information Exchange. Siemens. https://doi.org/10.1109/ISGT51731.2023.10066412
Fix, Elliott, Abhishek Banerjee, Ulrich Muenz, and Gab-Su Seo. Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters. Siemens, January, 1, 2023. Distributed by C-MIX - Community Microgrid Information Exchange. https://doi.org/10.1109/ISGT51731.2023.10066412
@misc{CMIX_Dataset_104,
title = {Investigating Multi-Microgrid Black Start Methods Using Grid-Forming Inverters},
author = {Fix, Elliott and Banerjee, Abhishek and Muenz, Ulrich and Seo, Gab-Su},
abstractNote = {This paper examines state-of-the-art microgrid (MG) black-start technologies with grid-forming (GFM) inverter-based resources (IBRs) and proposes black start and interconnection methods for 100\% inverter-based MGs. A multiple-MG approach is proposed and compared to the existing methods in a 4-bus, 12-GFM inverter simulation test setup. This investigation involves intelligent synchronization units that enable the autonomous synchronization of multiple MGs based on their terminal measurements. MGs in this setup are held at different loading levels and comprise averaged models of GFM inverters. The results of the black-start techniques are compared, and conclusions are drawn to better prepare MG planners and distribution system operators for next-generation, multi-MG, GFM inverter-based, black-start procedures.},
url = {https://cmix.openei.org/submissions/104},
year = {2023},
howpublished = {C-MIX - Community Microgrid Information Exchange, Siemens, https://doi.org/10.1109/ISGT51731.2023.10066412},
note = {Accessed: 2026-11-28},
doi = {10.1109/ISGT51731.2023.10066412}
}
https://dx.doi.org/10.1109/ISGT51731.2023.10066412
Details
Data from Jan 1, 2023
Last updated Mar 30, 2026
Submitted Jun 2, 2026
Organization
Siemens
Contact
Gab-Su Seo