SPIDERS Bi-Directional Charging Station Interconnection Testing
The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) program is a multi-year Department of Defense-Department of Energy (DOE) collaborative effort that will demonstrate integration of renewables into island-able microgrids using on-site generation control, demand response, and energy storage with robust security features at multiple installations. Fort Carson, Colorado, will be the initial development and demonstration site for use of plug-in electric vehicles as energy storage (also known as vehicle-to-grid or V2G).
Citation Formats
TY - DATA
AB - The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) program is a multi-year Department of Defense-Department of Energy (DOE) collaborative effort that will demonstrate integration of renewables into island-able microgrids using on-site generation control, demand response, and energy storage with robust security features at multiple installations. Fort Carson, Colorado, will be the initial development and demonstration site for use of plug-in electric vehicles as energy storage (also known as vehicle-to-grid or V2G).
AU - Simpson, Mike
DB - C-MIX - Community Microgrid Information Exchange
DP - Open EI | National Laboratory of the Rockies
DO - 10.2172/1096678
KW - Power electronics and inverters
KW - Power electronics
KW - Inverters
KW - Battery energy storage
KW - Electric vehicles
KW - Electric vehicle charging
KW - Transportation electrification
KW - Demand flexibility
KW - Load management
KW - Case studies
KW - Performance
KW - Cybersecurity
LA - English
DA - 2013/10/01
PY - 2013
PB - NLR
T1 - SPIDERS Bi-Directional Charging Station Interconnection Testing
UR - https://doi.org/10.2172/1096678
ER -
Simpson, Mike . SPIDERS Bi-Directional Charging Station Interconnection Testing. NLR, 1 October, 2013, C-MIX - Community Microgrid Information Exchange. https://doi.org/10.2172/1096678.
Simpson, M. (2013). SPIDERS Bi-Directional Charging Station Interconnection Testing. [Data set]. C-MIX - Community Microgrid Information Exchange. NLR. https://doi.org/10.2172/1096678
Simpson, Mike . SPIDERS Bi-Directional Charging Station Interconnection Testing. NLR, October, 1, 2013. Distributed by C-MIX - Community Microgrid Information Exchange. https://doi.org/10.2172/1096678
@misc{CMIX_Dataset_295,
title = {SPIDERS Bi-Directional Charging Station Interconnection Testing},
author = {Simpson, Mike },
abstractNote = {The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) program is a multi-year Department of Defense-Department of Energy (DOE) collaborative effort that will demonstrate integration of renewables into island-able microgrids using on-site generation control, demand response, and energy storage with robust security features at multiple installations. Fort Carson, Colorado, will be the initial development and demonstration site for use of plug-in electric vehicles as energy storage (also known as vehicle-to-grid or V2G).},
url = {https://cmix.openei.org/submissions/295},
year = {2013},
howpublished = {C-MIX - Community Microgrid Information Exchange, NLR, https://doi.org/10.2172/1096678},
note = {Accessed: 2026-08-06},
doi = {10.2172/1096678}
}
https://dx.doi.org/10.2172/1096678
Details
Data from Oct 1, 2013
Last updated Mar 30, 2026
Submitted Jun 2, 2026
Organization
NLR
Contact
Mike, Simpson

